The former factory buildings in Dale, along the river in the valley
Brownfield

Dale, Norway

Dale turns a former clothing factory in Vestland into a data center. The building is 48,000 sqm and power is already in place. A private pipe brings about 300 litres of cold mountain water per second for cooling. Reusing what is already there makes Dale the quickest capacity in our pipeline.

Project specs

Category
Brownfield
Ready for service (RFS)
Q4, 2027
Power capacity
23 MW
Available capacity
80 MW