In operation
K11, Norway
K11 at Forus was built by Equinor in 2013. It is fully contracted on long-term agreements. Phase 2 adds 6 MW and goes live in 2027. The site is five minutes from Sola airport. Power comes in through two independent cables. Excess heat is being integrated into Lyse’s energy network.
Project specs
- Category
- In operation
- Ready for service (RFS)
- In operation
- Power capacity
- 11 MW
- Available capacity
- 0 MW
K11 is fully occupied.
Ask about our other sites.
Help us get to know you and your needs a bit better through the form linked below. Everything you share is treated in strict confidence, and submitting comes with no obligation.
Contact usOther locations
View all
Suldal, NorwayA greenfield site in Ryfylke with abundant hydropower and room for phased expansion up to 300 MW.Visit location
Pori, FinlandOur Finnish site in Pori. 100 MW secured, up to 300 MW planned, with site and build permits in place.Visit location
Dale, NorwayA brownfield conversion in Vestland, reusing existing industrial power and buildings to reach service faster.Visit location