The K11 data center building at Forus
In operation

K11, Norway

K11 at Forus was built by Equinor in 2013. It is fully contracted on long-term agreements. Phase 2 adds 6 MW and goes live in 2027. The site is five minutes from Sola airport. Power comes in through two independent cables. Excess heat is being integrated into Lyse’s energy network.

Project specs

Category
In operation
Ready for service (RFS)
In operation
Power capacity
11 MW
Available capacity
0 MW

K11 is fully occupied.
Ask about our other sites.